Description
CentreCOM 210TS is a used item
This Allied Telesyn Centrecom 210TS Twisted Pair Micro Transceiver AT-210TS is a reliable option for those in need of networking cables and adapters. Its gray color and compatibility with all Allied Telesyn Centrecom 210TS models make it a versatile choice. Made in China, this micro transceiver is a cost-effective solution for those looking to connect their devices. The brand CentreCOM has a reputation for producing quality networking products, making this used item a reliable choice for your networking needs.
Overview
The Micro Ethernet Transceiver Series of products are direct attach IEEE 802.3 and
Ethernet Version 1.0 and 2.0 devices. ATI supports all common Ethernet media with
Micro Transceivers for thin coax (10BASE2), UTP (10BASE-T) and FOIRL LAN systems. The transceivers support a single AUI that attach directly to the AUI 15 pin connection found on most Ethernet stations (DTEs). Direct AUI connection reduces cabling costs for the installer.
All ATI transceivers are equipped with LEDs, providing status and diagnostic information. LEDs make LAN installation and troubleshooting easy for the installer. An easily accessible, user selectable SQE Test switch (heartbeat) is also provided on all models. ATI uses quality product packaging for increased reliability. ATI shows a high level of confidence in the micro transceiver products with a 5 year warranty.
Preparation
An SQE Test switch (heartbeat) is available to provide IEEE 802.3 Ethernet SQE Testing. If required, place the SQE Test switch to the “ON” position. An illuminated LED
indicates the SQE Test is enabled. If the DTE does not require an SQE Test, or if the
DTE is a repeater, place SQE Test switch to “OFF”. The SQE Test is disabled when
the LED is off. Disable the heartbeat function by turning the SQE Test switch “OFF”
when the Ethernet MAU is connected to a repeater to eliminate the possibility of excessive collisions.
Installation
The AT-210T or AT-210TS connects directly to a DTE or workstation AUI connector.
The AT-210TS, the slim-line version, includes a connector extension for tight installations. Plug the transceiver into the 15 pin AUI connection on the DTE and slide the connector latch into place. Power on the DTE and verify that the power indicator is lit.
Check to ensure the SQE Test setting is appropriate for equipment per the above
requirements. Plug a UTP cable into the RJ45 receptacle located on the AT-210T
transceiver. Check the Link LED to ensure equipment on the other end of link is operational. Stations will communicate if both local and remote transceivers’ link LEDs are
on. Four LEDs provide Link, SQE status, Polarity and Power information. If another
10BASE-T MAU is at the opposite end of the line, the UTP cabling must be crossed,
i.e. TD+ and TD- signals must be swapped with RD+ and RD- signals respectively. If
the polarity LED is lit, no polarity correction is occurring.
If the polarity LED is off, the polarity of RD+ and RD- are being swapped internally by the transceiver. 26 to 22 AWG (0.4 – 0.6 mm) UTP cable in multi-wire cable with 100